DOCUMENTARY REQUIREMENTS FOR OCCUPANCY PERMIT APPLICATION
1. Duly accomplished Unified Form and Notarized Certificate of Completion Form. – 4 Original Copies , back to back (Online)
2. Duly accomplished Certificate of Final Electrical Inspection Form(CFEI) – 4 Original Copies , back to back (Form only)
3. Owner’s copy of approved Building Permit Plans, Zoning Conformance, Building and Ancillary Permits (Architectural, Civil/Structural, Electrical, Plumbing Permits, etc.) Fire Safety Checklist and Fire Safety Evaluation Clearance.-4 Photocopies
4. Duly accomplished Construction Logbook, signed & sealed by Project Engineer/Architect in charge. – 1 copy
5. Photograph of the completed structures showing the front, sides, rear, septic tank, and interior areas (Electrical Fixtures). – 2 copies each
6. Photocopies of Valid Licenses (PRC ID) & current PTR of all involved professionals with dry seal & specimen signatures – 4 Photocopies
7. Expanding Envelope (2 pcs)
Folder (2 pcs/long)
8. The following requirements are to be submitted
if necessary:
-Notarized Affidavit of Change of Engineer – 4 copies
-For application filed by authorized representative : A sworn Special Power of Attorney for the representative to file/ follow-up/sign application and to claim decision on the application with valid ID. – 4 copies
-As built plans in case there are changes, modifications, and alterations in the approved building plans, signed and sealed by designed professionals and approved by the owner – 3 sets
-PCAB License for electrical works, MCB 200 amps and above
—
Para sa karagdagang impormasyon makipag ugnayan sa Office of the City Building Official: telepono bilang 717-8087 at e-mail address ppcbuildingofficial@gmail.com
For tracking/monitoring your applications, click the link below: